Case study
Villa Roof & Parapet Waterproofing on Palm Jumeirah
See how the crew applied roof coating on Palm Jumeirah at parapet bases, across flat sections and beneath an overhang.

Villa roof and parapet
Project overview
The Palm Jumeirah villa roof combines flat sections with low parapets, shallow upstands and an overhang. The crew sprayed across the open roof and moved in close to work along the parapet base. Below the overhang, the photographs show the tighter access around the same kind of roof junction.
- Spray application along the roof parapet.
- Coverage across flat sections beside raised details.
- Application under the low overhang.
- Location
- Palm Jumeirah
- Surface
- Flat deck, parapets and upstands
- Stage shown
- Application in progress
Work in detail
Roof sections with changes in access
The villa roof combines shallow upstands, low parapets and an overhang. The wide view shows the applicator working between these raised details and the exposed parts of the flat roof.
Working along edges and under cover
The crew moved the spray across the surface and brought it in close at the parapet base. The photos from beneath the overhang show how the team adjusted its working position where overhead space was limited.
Coating where the roof changes shape
Low walls and upstands split the roof into shorter working runs. The exposed deck has room to approach each detail from several directions, while the overhang limits where the applicator can stand. The close views show how the crew reached the junctions in each area.
Project photos

