Skip to content

Case study

Attic & Ceiling Treatment in Jumeirah Park

See application inside a low Jumeirah Park attic and the work around an exposed ceiling grid below the roof.

Crew applying treatment beneath a low tiled roof in Jumeirah Park
Crew applying treatment beneath a low tiled roof in Jumeirah Park

Villa attic and ceiling

Project overview

At this Jumeirah Park villa, the work took place beneath the tiled roof and above an exposed ceiling grid. One set of photographs follows spray application inside the shallow attic. A second set shows the crew working from below, around the open framing and building services.

  • Application within the low space below the roof tiles.
  • Access between timber trusses in the attic.
  • Work above the open ceiling grid and exposed services.
Location
Jumeirah Park
Surface
Attic and ceiling void
Stage shown
Application in progress

Work in detail

Access beneath the tiled roof

The attic has a shallow working height below pitched tiles and timber framing. A wide view records the exposed floor and shows where the trusses limit movement across the space.

Work in the attic and above the ceiling

The crew photos show application inside the attic, with equipment carried between roof members. A separate set documents work above an open ceiling grid, where the crew reached the space around the exposed framing and services.

Reaching the roof from inside

The attic photographs give a view across the floor beneath the sloping timber trusses. From below, the open ceiling grid provides a different route to the space around the structure and services. Seeing both access points explains why the work looks different between the two sets of photographs.

Project photos

Exposed attic floor and timber roof trusses
Exposed attic floor and timber roof trusses
Spray application in the shallow attic
Spray application in the shallow attic
Open ceiling grid and exposed framing below the roof
Open ceiling grid and exposed framing below the roof
Technician working above the open ceiling grid
Technician working above the open ceiling grid

Free · no obligation · same-day response

Protect it before the damage shows.

Your property is one of your largest investments. Early assessment prevents expensive structural damage later.

Property
What's going on?

We reply within 2 hours, 7 days a week.